Lakeview Towers

Pool Deck Resurfacing

Key Information

Client

Lakeview Towers

Location

Lakeview Towers
679 S Reed Court
Lakewood, CO

Topline

Problem and Solution

Problem

The existing coating was peeling due to inadequate prep by the previous installer and a system that wasn’t properly suited for the surface and anticipated conditions. Additionally, there were conditional issues with excessive exposure to ponding water and snow.

Solution

-Mechanically grind the entire surface to remove  existing failing coating and prepare the substrate to      the proper profile for new coating

-Remove failing control joints and route cracks in            substrate

-Install primer, base slurry coat, texture coat, solid
 color top coat and elastomeric joint sealant

Testimonials

"CBRE has successfully assisted HKEX to negotiate the best leasing terms, especially with Hongkong Land for our new lease of office floors at Exchange Square. CBRE has provided professional and innovative advice for the re-structuring of various HKEX's leases so that we can achieve large rental savings."